Aquifer test conducted

Within the framework of the projects CO2CARE and CO2MAN an aquifer test (or pumping test) was conducted in the 446 m deep observation well P300 on the 18th/19th January, 2012.

In order to determine the hydraulic parameters of the aquifer the pressure conditions were measured within the well during the withdrawal of water. Additionally, various parameters as for instance temperature and ph-value of the lifted water were measured and samples were taken for further analyses.


[Archive]